Project: Bovine-RV14A   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:Jeff Lawson   -  
Project:   Vans - RV-14A   -   VIEW REPORTS
Total Hours:601.5
Total Flight Time:
Start/Last Date:Jan 28, 2022 - No Finish Date
Engine:Lycoming YIO-390-EXP119 non-cert
Propeller:Hartzell G2YR/N7605W-2X 74 in. dia composite 2-blade
Panel:Dynon Skyview
 
Friendly URL: https://eaabuilderslog.org?s=Bovine-RV14A

Home or Last Project Picture

Jun 22, 2022     Flush riveting nose skin of the left aileron - (2.5 hours)       Category: Ailerons
In this work session, I started by taking off the temporarily assembled nose skin and prepping it for final assembly. This meant I had to remove the blue vinyl covering from both sides, some final hole deburring, dimple all of the rivet holes that would be receiving flush rivets, edge-rolling the two trailing edges using the special rolling tool from Cleaveland Tools, scuff the parts that would be primed, and then actually prime those portions of the nose skin. Again, I tried to minimize wasted primer by only painting it on the portions that would be in contact with the spar, other internal aluminum ribs, or the stainless steel counterweight tube.

After that, I started assembling the nose ribs into the nose skin and flush riveting the easy rivets in the nose skin. The assembly was a little confusing here because I wasn't following the order of operations strictly enough, so I ended up having to drill out a handful of the rivets just after installing them. I got a little more than half of them with hand-squeezer or hand-riveter (there were a few blind rivets to install), but there are still a few more that were too hard to reach and I will need to use the pneumatic rivet gun on tomorrow.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.